A power plant boiler project

Feb 17, 2022
(1) Project overview:
      Handling air volume: 1254800m3/h;
      Flue gas temperature: 120~160℃ (maximum temperature 200℃)
      Moisture content: 6~8%; Oxygen content: 6~7%
      Inlet dust concentration: 24~30g/Nm3
(2) Process flow: SCR denitration - bag dust removal - wet desulfurization
(3) Filter bag specification: Φ168*8300mm
(4) Filter bag material: gel silicon-based gradient ultra-wear-resistant filter material
(5) Dust emission: ≤ 5mg/Nm3

(6) Operation time: 2020-present

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

about

contact